dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Sensors and Switches - Emission Control Systems > < Positive Crankcase Ventilation Valve|Removal
Page 1
background image

Positive Crankcase Ventilation Valve: Service and Repair
Installation

INSTALLATION - 4.7L V-8

1. Clean out PCV valve opening at valve cover.
2. Check condition of PCV valve o-ring.
3. Apply engine oil to o-ring.
4. Place PCV valve (2) into valve cover.
5. Attach plastic line (1) to valve.

Sensors and Switches - Emission Control Systems > < Positive Crankcase Ventilation Valve|Removal