RAM 1500 Truck 2WD V8-5.7L VIN 2 (2006)
5. Connect the electrical connector (1).
6. Connect the drain tubes (1) to the sunroof.
7. Adjust the sunroof glass.
8. Connect battery negative cable.
9. Install the vehicle headliner.
10. Perform the sunroof position calibration. See: Body and Frame/Roof and Associated Components/Sunroof / Moonroof/Testing and
Inspection/Programming and Relearning/Sunroof Position Calibration
11. Perform the Excessive Force Limitation (EFL) calibration.
12. Verify proper operation of the power sunroof system.