RAM 1500 Truck 4WD V8-5.9L VIN Z (2002)
4. Install the inner axle seal (Fig. 24).
5. Install the shift collar in the axle housing.
6. Lubricate splined end of the intermediate axle shaft with multipurpose lubricant.
7. Insert the intermediate axle shaft into the differential side gear.
CAUTION: Apply all-purpose lubricant to the axle shaft splines to prevent damage to the seal during axle shaft installation.
8. Insert axle shaft into the tube and engage the splined end of the shaft with the shift collar.
9. Install the vacuum shift motor housing.