RAM 1500 Van V8-5.9L VIN Z (1998)
13. Install throttle and gearshift levers on valve body manual lever shaft.
14. Check and adjust front and rear bands if necessary.
15. Connect solenoid case connector wires.
16. Install oil pan and new gasket. Tighten pan bolts to 17 Nm (13 ft. lbs.) torque.
17. Lower vehicle and fill transmission with MOPAR(r) ATF+4, type 9602 fluid.
18. Check and adjust gearshift and throttle valve cables, if necessary.