dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Charging System > < Battery Holddown|Page 4585
Page 2
background image

15.8 Nm (140 in. lbs.).

9. Final tighten the four nuts with washers that secure the battery tray support to the stud plates on the front wheelhouse inner panel. Tighten the nuts

to 15.8 Nm (140 in. lbs.).

10. If the left battery tray is being installed, install the battery temperature sensor onto the left battery tray. Refer to Battery Temperature Sensor for the

location of the proper battery temperature sensor installation procedures.

11. Install the battery onto the battery tray. Refer to Battery for the location of the proper battery installation procedures.

Charging System > < Battery Holddown|Page 4585