dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Procedures|Page 2840 > < Procedures|Page 2838
Page 10
background image

21. Install engine cover and tighten bolts (1) to 10 Nm (89 in. lbs.).
22. Connect negative battery cable(s).
23. Fill coolant system See: Engine, Cooling and Exhaust/Cooling System/Service and Repair.
24. Start engine and check for coolant or exhaust leaks.

Exhaust Gas Recirculation (EGR) Cooler Bypass Valve - Removal

REMOVAL

EGR CROSSOVER TUBE COVER

1. Disconnect both negative battery cables.
2. Remove bolts (1) and the EGR crossover tube cover (2).

EGR CROSSOVER TUBE

Procedures|Page 2840 > < Procedures|Page 2838