RAM 2500 Truck 4WD L6-5.9L DSL Turbo VIN 6 (1999)
Fig. 28
7. Fit the link yoke on the remaining two trunnions and press both bearing caps into place.
8. Install the snap rings.
Fig. 29
9. Install the centering kit assembly inside the link yoke making sure the spring is properly positioned.