dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Cruise Control Servo|Description and Operation|Page 7241 > < Cruise Control Servo|Description and Operation
Page 1
background image

Cruise Control Servo: Testing and Inspection

For additional testing and inspection information please refer to Powertrain Management/Computers and Control Systems/Testing and Inspection.  
See: Powertrain Management/Computers and Control Systems/Testing and Inspection

For complete speed control system diagnosis, refer to the appropriate Powertrain Diagnostic Procedures. To test the speed control servo only, refer to the
following:

The engine must be started and running for the following voltage tests.
1. Start engine.

Speed Control Servo Location

2. Disconnect 4-way electrical connector at servo. Servo is attached to battery tray.
3. Turn speed control switch to ON position.

Fig. 4 Servo Harness Connector

4. Check for battery voltage at pin-3 of wiring harness 4-way connector. This is the 12 volt feed from the stoplamp switch. When the brake pedal is

Cruise Control Servo|Description and Operation|Page 7241 > < Cruise Control Servo|Description and Operation