RAM 3500 Chassis Cab Truck 2WD L6-6.7L DSL Turbo (2010)
1. Position the charge air cooler (2). Install the bolts (1) and tighten to 2 Nm (17 in. lbs.) torque.
2. Install the air intake system tubes (4) to the charge air cooler (2). With the clamps in position, tighten the clamps to 11 Nm (95 in. lbs.) torque.
3. Install the transmission auxiliary cooler (if equipped) See: Transmission and Drivetrain/Automatic Transmission/Transaxle/Transmission
Cooler/Service and Repair.
4. Install the A/C condenser (if A/C equipped) See: Heating and Air Conditioning/Condenser HVAC/Service and Repair/A/C Condenser -
Installation. Recharge A/C system See: Heating and Air Conditioning/Service and Repair/Refrigerant System Charge.
5. Connect the battery negative cables.
6. Start engine and check for boost system leaks.