dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Oil Line, Turbocharger > < Procedures|Page 2672
Page 2
background image

1. Position the charge air cooler (2). Install the bolts (1) and tighten to 2 Nm (17 in. lbs.) torque.
2. Install the air intake system tubes (4) to the charge air cooler (2). With the clamps in position, tighten the clamps to 11 Nm (95 in. lbs.) torque.
3. Install the transmission auxiliary cooler (if equipped)   See: Transmission and Drivetrain/Automatic Transmission/Transaxle/Transmission

Cooler/Service and Repair.

4. Install the A/C condenser (if A/C equipped) See: Heating and Air Conditioning/Condenser HVAC/Service and Repair/A/C Condenser -

Installation. Recharge A/C system See: Heating and Air Conditioning/Service and Repair/Refrigerant System Charge. 

5. Connect the battery negative cables.
6. Start engine and check for boost system leaks.

Oil Line, Turbocharger > < Procedures|Page 2672