RAM 3500 HD Truck 2WD L6-6.7L DSL Turbo VIN A (2007)
1. Connect the ground lead of a voltmeter to a known good ground.
2. Connect the other lead of the voltmeter to the selected test point. The vehicle ignition may need to be turned ON to check voltage. Refer to the
appropriate test procedure.
Testing For Continuity
STANDARD PROCEDURE - TESTING FOR CONTINUITY
1. Remove the fuse (1) for the circuit being checked or, disconnect the battery.