RAM 3500 HD Truck 2WD L6-6.7L DSL Turbo VIN A (2007)
11. Clean each end of EGR crossover tube and its connection points of any old gasket material
12. Install new gaskets (doughnuts) (2) and (5) to each end of tube.
13. Position EGR crossover tube (4) to engine.
14. Position bolt (3) at center of EGR crossover tube. Install bolt loosely (finger tight).
15. First, tighten EGR tube clamp (1) to 10 Nm (7 ft. lbs.), then tighten clamp (6) to 10 Nm (7 ft. lbs.).
16. Tighten clamp bolt (3) to 10 Nm (7 ft. lbs.).
17. Install upper heat shield (6) and nuts (7). Tighten nuts to 24 Nm (18 ft. lbs.) torque.
18. Install lower heat shield (9), bolts (10), and nut (8). Tighten nut/bolts to 24 Nm (18 ft. lbs.) torque.