dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Cylinder Liner > < Procedures|Page 1689
Page 11
background image

33.   Install the turbocharger.

34.   Install the fuel rails and lines.

35.   Install the flex plate.

36.   Install engine in vehicle.
37.   Fill engine oil with proper oil to correct level.
38.   Start the engine and check for leaks.

Cylinder Liner > < Procedures|Page 1689