dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Body and Frame|Service and Repair|Page 5176 > < Body and Frame|Service and Repair|Page 5174
Page 4
background image

1. Carefully grind remaining sheet metal (5) off of A-pillar inner section (4).

Preparing waist rail paneling for installation

The following steps apply for the right side of the of waist rail paneling (1) and must be performed on the left side with locations reversed.

1. Mark holes with the following gaps:

a = 25 mm,

Body and Frame|Service and Repair|Page 5176 > < Body and Frame|Service and Repair|Page 5174