Workshop Repair Manuals

Dodge Workshop Manuals

[PREV PAGE] [NEXT PAGE]

dodge Workshop Repair Guides


Sprinter 3500 V6-3.0L DSL Turbo VIN 45 (2007)

Relays and Modules > Relays and Modules - Power and Ground Distribution > Relay Box > Component Information > Service and Repair > Power Distribution Center (PDC) - Removal > Page 149

Page 2
background image

8. Retrieve the isolating connector (1) from under the accelerator pedal and position it onto the grounding stud.
9. Slide the isolating connector locking tab (2) upward to secure the connector to the stud.

Relays and Modules > Relays and Modules - Power and Ground Distribution > Relay Box > Component Information > Service and Repair > Power Distribution Center (PDC) - Removal > Page 149

[PREV PAGE] [NEXT PAGE]