dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Air Conditioning Switch|Description and Operation|Page 3113 > < Air Conditioning Switch|Description and Operation
Page 1
background image

Air Conditioning Switch: Testing and Inspection

Air Conditioner Switch Connector

1.

In order to remove the A/C Switch for testing, refer to COMPONENT REPLACEMENT AND REPAIR PROCEDURES.

2.

With the switch in the ECONOMY position (depressed 1 step), check for continuity between each set of terminals. # 1 and # 4, # 4 and # 5, and #
3 and # 6.
NOTE:  The positive lead of the ohmmeter should be connected to terminal # 4.

3.

Depress the A/C switch to the second step, and check for continuity between each set of terminals. # 1 and # 2, # 1 and # 4, # 2 and # 4, # 4 and #
5, and # 3 and # 6.
NOTE:  The positive lead of the ohmmeter should be connected to terminal # 4.

Air Conditioning Switch|Description and Operation|Page 3113 > < Air Conditioning Switch|Description and Operation