dodge Workshop Repair Guides

Dodge Workshop Service and Repair Manuals

Automatic Shut Down (ASD) Relay <--> [Main Relay (Computer/Fuel System)] > < Component Tests and General Diagnostics
Page 1
background image

Powertrain Control Module: Service and Repair

Fig. 33 Auxiliary Jumper Terminal

POWERTRAIN CONTROL MODULE SERVICE

The PCM attaches to a bracket between the air cleaner housing and Power Distribution Center (PDC) Fig. 33.

REMOVAL

1. Disconnect negative cable from auxiliary jumper terminal Fig. 33.
2. Disconnect both 40-way connectors from PCM.

Fig. 34 PCM Bracket Screws

3. Remove screws attaching PCM to bracket Fig. 34.
4. Lift PCM up to remove it from vehicle.

INSTALLATION

1. Install PCM. Tighten mounting screws.
2. Attach both 40-way connectors to PCM.
3. Connect negative cable to auxiliary jumper terminal.

Automatic Shut Down (ASD) Relay <--> [Main Relay (Computer/Fuel System)] > < Component Tests and General Diagnostics