Removal and Installation Removal | -
General Notes - Required removal operations: Windshield, side windows, tailgate, headliner, interior trim panels and rear lights.
| | -
NOTE:Heat the roof panel bonded areas from the outside before removal. Roof panel | Installation NOTE:Before resistance spot welding of body panels with a total panel thickness of 3 mm and greater, the welding equipment instructions contained in sub-section 501-25A must be followed. | -
Roof panel - Drill holes for puddle welding.
| | -
Prepare the bonded areas. - Apply single-component PU glass adhesive.
| | -
Fit the roof panel and weld in place. - Resistance spot weld.
- Puddle weld.
| | |