E 150 V8-4.6L (2007)
7. Position the engine control wiring harness retainer onto the valve cover stud.
8. NOTE: 4.6L (2V) shown, 5.4L (2V) similar.
Connect the LH ignition coil and fuel injector electrical connectors and the wiring harness retainers.
4.6L (2V) engines
9. Install the EGR tube.
^
Hand-tighten the upper and lower fittings.
^
Tighten to 40 Nm (30 ft. lbs).