E 150 V8-4.6L (2007)
5. Position the Y-pipe flange and install the 4 nuts.
^
Tighten to 40 Nm (30 ft. lbs).
6. Connect the battery ground cable. For additional information, refer to Battery.
5. Position the Y-pipe flange and install the 4 nuts.
^
Tighten to 40 Nm (30 ft. lbs).
6. Connect the battery ground cable. For additional information, refer to Battery.