E 150 V8-4.6L (2007)
Carefully clean both sealing surfaces.
-
Install a new EGR system module gasket with the side with the raised ring facing the intake manifold.
2. Install the EGR system module and bolts.
-
Tighten the bolts in 2 stages.
-
Stage 1: Tighten to 25 Nm (18 lb-ft).
-
Stage 2: Tighten an additional 90 degrees.
3. Connect the EGR system module vacuum line.
4. Connect the EGR system module electrical connector.
5. Install the exhaust manifold-to-EGR system module tube.