E 250 V8-4.6L VIN W (2006)
^
Connect the bulkhead inter-connector by pressing it in place by hand and fully seating the connector in place.
^
Connect the EPC solenoid by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully
through the connector slots.
^
Connect the TCC by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully through the
connector slots.
^
Connect the shift solenoid SSA and SSB by pressing in place by an and seating the connector in place. Make sure that the terminals pass fully
through the connector slots.
4. Install the manual control lever.