E 250 V8-5.4L SOHC VIN L (2004)
27. Install the generator upper support bracket.
28. Install the accelerator cable routing bracket.
29. Install the differential pressure feedback EGR system bracket.
30. Connect the differential pressure feedback EGR sensor.
1. Connect the electrical connector.
2. Connect the two hoses.