E 250 Van V8-351 5.8L VIN G 2-bbl (1984)
Figure 27
Service Procedure
NOTE:
Prior to venturi tube installation, the evaporator housing sealing procedures and installation of the straight condensate drain tube as described
in TSB 85-11-16 and TSB 86-9- 14, must be performed (Figure 27). (Do not install screen or drain tube in motor blower housing.)