E 250 Van V8-7.3L DSL (1988)
accumulator/drier.
6.
Cap all open refrigerant connections to prevent entry of dirt or moisture.
7.
Reverse procedure to install. Use new O-rings lubricated with suitable oil.
8.
Leak test, evacuate and charge system. Check system for proper operation.