E 350 V10-6.8L (2007)
11. Connect the RH 5 fuel injector electrical connectors.
12. Connect the A/C compressor and the CKP sensor connectors and install a tie-strap.
13. Position the splash shield and install the pushpin retainers.
14. Connect the RH 5 ignition coil electrical connectors.