E 350 V8-6.0L DSL Turbo (2007)
4. NOTE: It will be necessary to position back or remove the heat insulating wrap.
Disconnect the injection pressure regulator (IPR) valve electrical connector.
5. Using the special tool, remove the IPR valve.
-
To install, tighten to 50 Nm (37 lb-ft).
6. To install, reverse the removal procedure.