E 450 V8-5.4L (2009)
14. Connect the engine wiring harness retainer and the 2 PCM electrical connectors.
15. Connect the electrical connector.
16. Position the engine control wiring harness retainer onto the valve cover stud.
17. NOTE: 4.6L (2V) shown, 5.4L (2V) similar.
Connect the LH ignition coil and fuel injector electrical connectors and the wiring harness retainers.
4.6L (2V) engines
18. Install the EGR tube.
-
Hand-tighten the upper and lower fittings.
-
Tighten to 42 Nm (31 lb-ft).