Econoline E250 3/4 Ton V8-4.6L SOHC VIN W (2000)
5. Install the shaft seal snap ring.
6. Carry out the A/C compressor external leak test.
7. Install the shaft seal felt.
8. Install the A/C clutch. For additional information, refer to Compressor Clutch and Compressor Clutch Coil.
