Econoline E250 3/4 Ton V8-4.6L SOHC VIN W (2000)

Powertrain Control Module: Procedures
REMOVAL
1. Disconnect the battery ground cable. For additional information, refer to Battery.
2. Remove the air cleaner assembly. For additional information, refer to Fuel Delivery and Air Induction.
3. Disconnect the Powertrain Control Module (PCM) electrical connector.
4. Remove the PCM.
1. Remove the nuts.
2. Remove the cover.
3. Remove the PCM.
INSTALLATION
1. To install, reverse the removal procedure.