Econoline E250 3/4 Ton V8-4.6L SOHC VIN W (2000)
1. Install the EPC solenoid.
2. Connect the molded lead frame to the solenoids.
-
Connect the bulkhead inter-connector.
-
Connect the EPC solenoid.
-
Connect the TCC.
-
Connect the shift solenoid SSA and SSB.
3. Install the manual control lever.
