Econoline E250 3/4 Ton V8-4.6L SOHC VIN W (2000)
1
Remove the bolt.
2
Remove the nut.
3
Remove the bracket.
Installation
1. Follow the removal procedure in reverse order.
-
Adjust the shift cable.
1
Remove the bolt.
2
Remove the nut.
3
Remove the bracket.
Installation
1. Follow the removal procedure in reverse order.
-
Adjust the shift cable.