Econoline E250 3/4 Ton V8-4.6L SOHC VIN W (2000)
Assemble and position the special tools.
7. Note: This step duplicates final pinion bearing preload.
Tighten the special tool to the specification shown.
8. Note: The special tool must be offset to obtain an accurate reading.
