Econoline E250 3/4 Ton V8-5.4L CNG VIN M (1998)
12. Remove the flywheel inspection plate.
13. Position the two screw jacks under the rear left and right sides of the oil pan rails.
14. Raise the engine 10 1/4 inches from the crankshaft pulley to the lower edge of No. 1 crossmember.
CAUTION: Do not exceed 10-V4 inches of elevation or the throttle body will contact the vehicle body and damage to the throttle body may
occur.