Econoline E250 3/4 Ton V8-5.4L CNG VIN M (1998)
4. Tighten the bolts in two stages, in the sequence shown.
-
Stage 1: 2 Nm (18 inch lbs.)
-
Stage 2: 8-12 Nm (71-106 inch lbs.)
5. Install the studs.
4. Tighten the bolts in two stages, in the sequence shown.
-
Stage 1: 2 Nm (18 inch lbs.)
-
Stage 2: 8-12 Nm (71-106 inch lbs.)
5. Install the studs.