Econoline E250 3/4 Ton V8-5.4L CNG VIN M (1998)
4. Remove the two bolts and the EGR valve gasket.
-
Discard the gasket.
INSTALLATION
1. Follow the removal procedure in reverse order.
NOTE: Install a new EGR gasket.
4. Remove the two bolts and the EGR valve gasket.
-
Discard the gasket.
INSTALLATION
1. Follow the removal procedure in reverse order.
NOTE: Install a new EGR gasket.