Econoline E250 3/4 Ton V8-5.4L CNG VIN M (1998)
2. Tighten the tie rod adjusting sleeve.
3. Install the ball stud in the front wheel spindle, then tighten the castle nut.
4. Install a new cotter pin.
5. Check toe-in.
6. Check clear vision.
2. Tighten the tie rod adjusting sleeve.
3. Install the ball stud in the front wheel spindle, then tighten the castle nut.
4. Install a new cotter pin.
5. Check toe-in.
6. Check clear vision.