Econoline E250 3/4 Ton V8-5.4L SOHC VIN L (1998)
3.
Tighten the bolts in the sequence shown.
4. Install the crankcase vent connector and hose into the valve cover.
5. Install the fuel charging wiring on the valve cover studs.
6. Install the oil filler tube and clamp on the valve cover.