Econoline E350 1 Ton V10-6.8L VIN S (1998)
9. Install the heater water hose and position the clamp.
10. Connect the water temperature indicator sending unit electrical connector.
11. Install the generator.
12. Install the drive belt.
13. Install the coil and plug boots.