Econoline E350 1 Ton V8-5.4L CNG VIN M (1999)
Installation
1. Use the (A) Valve Spring Compressor to compress the (B) valve spring and install the (C) camshaft roller followers.
2. Remove the Valve Spring Spacer.
3. Install the valve covers.
Installation
1. Use the (A) Valve Spring Compressor to compress the (B) valve spring and install the (C) camshaft roller followers.
2. Remove the Valve Spring Spacer.
3. Install the valve covers.