Econoline E350 1 Ton V8-5.4L CNG VIN M (1999)
2. Tighten the bolts in three stages, in the sequence shown.
Stage 1: 2 Nm (18 inch lbs.)
Stage 2: 20 Nm (15 ft. lbs.)
Stage 3: Rotate 60 degrees
2. Tighten the bolts in three stages, in the sequence shown.
Stage 1: 2 Nm (18 inch lbs.)
Stage 2: 20 Nm (15 ft. lbs.)
Stage 3: Rotate 60 degrees