Econoline E350 1 Ton V8-5.4L CNG VIN M (1999)
Fluid Line/Hose: Service and Repair
4R100
Removal
1. Remove the fluid cooler tubes.
1
Remove the fluid cooler tubes from the cooler bypass valves.
2
Remove the fluid cooler tube from the transmission fluid cooler and the radiator.
3
Remove the fluid cooler tube from the transmission fluid cooler and the radiator.
Installation
1. Install the fluid cooler tubes.
^
Install the fluid cooler tubes from the radiator and the transmission fluid cooler.
^
Install the fluid cooler tube from the transmission fluid cooler to the cooler bypass valve.
^
Install the fluid cooler tube from the radiator to the cooler bypass valve.
2. Fill the transmission with the specified fluid to the proper level and inspect for leaks.