Econoline E350 1 Ton V8-5.4L CNG VIN M (1999)
6. Remove the shift cable bracket (vehicles equipped with 4.2L engine).
1
Remove the bolt.
2
Remove the nut.
3
Remove the bracket.
Installation
1. Follow the removal procedure in reverse order.
^
Adjust the shift cable.