Econoline E350 1 Ton V8-5.4L CNG VIN M (1999)
2. Lower the High Lift Transmission Jack while aligning the (A) retainer studs with the holes in the (B). Allow the full weight of the transmission to
rest on the.
3. Remove the High Lift Transmission Jack.
4. Position the (A) hanger and install the (B) bolt. Tighten the retainer-to-extension housing bolts.
5. Install the nuts.
6. Remove the supports and lower the vehicle.