Econoline E350 1 Ton V8-5.4L CNG VIN M (1999)
5. Tighten the main control valve body bolts in the sequence shown.
6. Install the shift solenoid and the torque converter clutch (TCC) solenoid.
1
Install the shift solenoid and the torque converter clutch (TCC) solenoid.
2
Install the bolts.