Econoline E350 1 Ton V8-5.4L Prop SOHC VIN Z (1998)
9. Install the oil fill pipe.
1. Install the oil fill pipe.
2. Install the screw.
10. Install the battery tray.
11. Install the battery.
12. Using proper procedures, evacuate and charge the A/C system. See: Service and Repair/Evacuation and Charging