Edge AWD V6-3.5L (2009)
49. Attach all of the wiring harness retainers to the RH valve cover and stud bolts.
50. Connect the 3 RH coil-on-plug electrical connectors.
51. Connect the RH VCT solenoid electrical connector.
52. Connect the Power Steering Pressure (PSP) switch electrical connector.
53. Connect the RH Catalyst Monitor Sensor (CMS) sensor electrical connector.
54. Using new gaskets, install the upper intake manifold and the 6 bolts.
-
Tighten in the sequence shown to 10 Nm (89 lb-in).