Edge FWD V6-3.5L (2007)
11. Remove the special tools (alignment pins).
12. NOTE: The remainder of the engine front cover bolts (1, 2, 3, 4, 5, 6, 9, 10, 11, 12, 13, 14, 15, 16, 21 and 22) must be installed and tightened
within 60 minutes of the initial sealant application.
Install bolts 1, 2, 3, 4, 5, 6, 9, 10, 11, 12, 13, 14, 15, 16, 21 and 22 and tighten in the sequence shown in 2 stages:
^
Stage 1: Tighten to 10 Nm (89 inch lbs).
^
Stage 2: Tighten to 24 Nm (18 ft. lbs).
13. Install the 2 engine mount studs.
^
Tighten to 18 Nm (13 ft. lbs).