ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 9818 > < Initial Inspection and Diagnostic Overview|Page 9816
Page 9
background image

E1-E3

Normal Operation

The smart junction box (SJB) supplies voltage to the demand lamps on circuit CLN09 (YE/GN). The demand lamps are grounded through circuit
GD133 (BK).

Possible Causes

-

Fuse

-

Circuitry

-

SJB

Test F: An Individual Demand Lamp Is Inoperative

PINPOINT TEST F: AN INDIVIDUAL DEMAND LAMP IS INOPERATIVE

Initial Inspection and Diagnostic Overview|Page 9818 > < Initial Inspection and Diagnostic Overview|Page 9816