Edge FWD V6-3.5L (2007)
E1-E3
Normal Operation
The smart junction box (SJB) supplies voltage to the demand lamps on circuit CLN09 (YE/GN). The demand lamps are grounded through circuit
GD133 (BK).
Possible Causes
-
Fuse
-
Circuitry
-
SJB
Test F: An Individual Demand Lamp Is Inoperative
PINPOINT TEST F: AN INDIVIDUAL DEMAND LAMP IS INOPERATIVE