ford Workshop Repair Guides

Ford Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 11024 > < Initial Inspection and Diagnostic Overview|Page 11022
Page 13
background image

AB1-AB3

Tests AC: The Trailer Battery Charging Is Inoperative/Does Not Operate Correctly

PINPOINT TEST AC: THE TRAILER BATTERY CHARGING IS INOPERATIVE/DOES NOT OPERATE CORRECTLY

Normal Operation

The trailer battery charge relay coil receives voltage from the smart junction box (SJB) fuse 12 (5A) through circuit CBP12 (GN/WH) when the
ignition switch is in the RUN or ACC position. Ground for the trailer battery charge relay coil is supplied through circuit GD120 (BK/GN). The
battery junction box (BJB) fuse 13 (30A) supplies voltage to the trailer battery charge relay switch through circuit SSB13 (GY/RD). When the trailer
battery charge relay is energized, the voltage is routed to the trailer tow connector through circuit CAT14 (OG).

This pinpoint test is intended to diagnose the following:

-

Fuse

-

Wiring, terminals or connectors

-

Trailer battery charge relay

-

Trailer tow connector

-

Trailer

-

SJB

Initial Inspection and Diagnostic Overview|Page 11024 > < Initial Inspection and Diagnostic Overview|Page 11022