F 100 2WD Pickup L6-300 4.9L VIN E 1-bbl (1982)
Starter Armature: Testing and Inspection
Armature & Field Grounded Circuit Test
Fig. 4 Field grounded circuit test connections
1.
Connect jumper lead to positive battery terminal.
2.
Connect negative voltmeter lead to negative battery terminal.
3.
Touch positive voltmeter lead to commutator and jumper wire to armature.
4.
If voltmeter indicates voltage, armature windings are grounded.
5.
Make connections as shown, Fig. 4. If voltmeter indicates voltage, field windings are grounded.